So far I have built two turnouts, one left and one right, with the Fast Tracks jig. The toughest part is gapping the point rails after everything is soldered together. So far the X-acto razor saw is doing the job just fine.
I ordered a stock rail filing tool to assist in the turnout building, it should be here soon. This is the first time I have built turnouts, and the jigs certainly help the process. I don't know if I would have wanted to tackle the project without them.
Monday, November 1, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment