Tuesday, October 13, 2026

Long Time Coming

When last I wrote I was rebuilding benchwork.

Since that time I have completed building the benchwork, started on laying cork and track, discovering a bow in a long piece of benchwork, building a leg to correct that bow, and starting the build of control panels.

And cataract surgery. Let us not forget that. My eye doctor tells me it's a sign of gaining wisdom. I told him it's a sign of impending geezerhood. My daughter informs me that "impending" no longer applies as I am already well down that path.

At any rate, when I left off I was letting the plywood relax before painting. The paint was applied, new foam put down, and track planning started soon after. I eliminated the hill past the turnaround tunnel, leaving it on a 1/2" rise around the back corner, and pulling it forward enough to allow for scenery behind the track.

I then put some cork down, relocating the coal plant further back to allow more room for the narrow gauge. This allowed for the location of a passenger station, as I mentioned in my last post, between the narrow and standard gauge rails.

Once the cork was down the standard gauge track laying began. Instead of putting switch machines on each turnout, this time I opted to leave the electrofrog turnouts untouched and use only large radius on all the mainline tracks. This eliminated a lot of wiring.

The downside to this is that as the layout ages, the contacts at the turnouts are going to suffer. This can result in electrically dead frogs and point rails. The fix will be to institute a rigorous electrical cleaning program at the point rail contacts from the very beginning using contact cleaner and mechanical cleaners. 

Since most of the turnouts are easily reached from the aisles this shouldn't be a big problem, and the three turnouts that are not easily reached are still thrown by Tortoise and wired appropriately for good lasting frog power switching.

The troublesome curved turnout at the west yard entrance was the next issue to be addressed, The curves were relaid to allow for short stretches of straight track entering and leaving the turnout at all three points. Hopefully this should end the issues of derailing at that turnout. When I get power back on the track I'll run a Northern through that turnout in both directions at various speeds to test it.

I was also able to carefully prepare the vertical transitions at each end of the hill, as well as the transition from vertical change to 1/2" riser just before the south loop tunnel portal. Once again, the magic of Bachmann steam will reveal any issues with the transitions in plenty of time to correct them prior to scenic work.

Another issue that was dealt with was the benchwork for the coal plant. I relaid the track for the coal plant and much to my dismay I found the cars I put on the tracks rolled towards the center. I got out my levels and straight-edges and found there was a bow in the middle of that piece of benchwork.

This piece of bench is six feet in length, supported on each end by a leg. Obviously this has proved to be insufficient, so a third leg positioned right about the middle of the bench was built and installed. This has leveled the bench out along its length, and the cars no longer roll towards the center of the bench when placed at the end of the yard tracks.

Of course, this means that the eight foot length of the yard on the opposite side of the room will also likely need a leg or two in the middle... but that is a problem for another day. That area is still "here be dragons" territory.

All the track except the double main on the hill is laid out and the control panel construction has begun. I decided I wanted to get the control panels at least laid out before wiring the track, so that is why I have veered off in that direction.

I laid out my control panels and planned the switch work for each section, drilled the holes, and installed the switches and LEDs. Each Tortoise controlled turnout will have LEDs indicating which route is selected since they are far enough away that they will not be easily verified just by looking at them.

I am also wiring the layout for DC block controls even though I will usually be running DCC. I did this with the previous layout as well, but in the early version there were only 4 blocks. The new layout has 13. Most of the block switches are easily seen from the area where the operator will be standing, but there are two places on the hill where the siding turnouts are far enough away from each other that some sort of signal will be needed.

The dual track section over the hill is arranged in such a way that each turnout is a right hand turnout. That means that the straight route from each turnout comes to the diverging side of the opposite turnout. The cab selector switch adjacent to each turnout control switch controls the straight route, which means that the cab control for the diverging route is co-located with the opposite turnout switch. These switches are on opposite ends of the layout, so it is not a simple matter to select the diverging route cab.

So, in order to prevent switching to the diverging route when the opposite cab is selected, a pair of LEDs are located near each turnout switch to indicate which cab is selected for the diverging route. Most of the time trains in each direction will exit the turnouts on the straight route, and the length of the dual track section is long enough to allow the operator to get to the other end to select the proper cab to enter the diverging route of the opposite turnout. Of course, when the layout is being operated as DCC this is not going to be an issue.

I have ordered all the wire I am going to need, and laid out all of the switches in their proper arrangements. The next step will be to remove all of the switches, paint the panels, and lay out the track arrangements on the panels with colored tape before sealing it all in a clear coat to keep the tape from peeling up. After that the switches can be reinstalled and the wiring completed.

Back to work tomorrow, so this will take a while to accomplish. I'm sure there will be snags and pitfalls along the way, and I will deal with them as they come.

Monday, August 31, 2026

New Beginnings

 When I built the benchwork for the new railroad, I made several mistakes.

The basic framework is built of 1x2 dimensional lumber glued and screwed in an L shape to provide dimensional stability. It is fastened to an L channel, likewise made of 1x2 dimensional lumber, around the periphery of the room with legs at the critical junction points to keep everything flat and level. This has worked fairly well, but the mistakes soon followed.

At first I laid my 1/2 inch foam right on top of this framework. Of course it started to sag right away, I should have either used 1 inch foam, which is much more rigid, or used a plywood sub-surface. Fortunately I had not laid any track, so back to Big Orange I went.

This is where I made mistake number 2. Rather than use plywood I opted for 1/8 inch Masonite. In case you are not familiar with Masonite, it is a light flexible particle board type material, with the emphasis on flexible. It looked good initially, so I started laying out track.

It didn't take long before my track looked like a roller coaster. I tried shoring the track up with dimensional lumber underneath fastened to the framework, but had limited success. I though about installing more bracing from the underneath, but if I did so not only would I soon have way to much bracing, but said brace work would soon interfere with switch machines and wiring. To add to the toxic stew, anything that remained outside of the right-of-way would also undulate, which would make placing buildings (especially large ones) problematic.

And so this weekend I took all the track work up, peeled the foam from the Masonite, and pulled the Masonite from the framework. This included pulling all the feeder wiring out since it was zip tied to anchors fastened to the bottom side of the sub-surface. I then cut new 1/4 inch plywood and laid it atop the benchwork to flatten out.

Even though essentially I am starting all over, this has actually afforded me an opportunity to rethink part of what I am doing. For instance, the location of my coal washing plant doesn't leave enough room for the narrow gauge between the plant and the table edge. This was made necessary by the addition of a hill leading to the tunnel over the right loop, which was then followed by a larger hill up to the corner of the room where the peak was, followed by a long grade down the back side behind the main layout area.

The hill was made exclusively with Woodland Scenics risers to a 2 inch height at the peak. Through the tunnel the track was 1 inch above the surface. The up  grade started at the beginning of the curve to the turnaround section (defined as the part of the track immediately to the right of the town going all the way around to the left loop) and ended at the end of the straightaway behind the town. This hill limited my scenery potential behind the track work through town and added operational difficulties that I had not planned for.

With the restart I am now able to eliminate this hill (another mistake, I had not allowed room for any scenic work behind the risers, they were flat against the wall, which means they would have had nothing but sky behind them, which is not very prototypical) although I will allow for a slightly smaller rise (about a half inch) through the tunnel loop and along the wall behind the coal plant. This time I will leave room for scenery behind the risers, I won't have a further grade behind the coal plant, and it will drop much more quickly behind the town instead of taking up the full length which will allow for more scenery through town.

This in turn will allow me to move the coal plant back from the edge another 3-4 inches, which will allow plenty of room for the narrow gauge. I am changing up the standard gauge track work to join the coal plant siding back to the main just before the return loop curve, which will allow room to put a passenger station to serve the narrow gauge end-of-line, which will once again end in a turntable.

I am going to let the newly-cut plywood relax for a week, and next weekend I will apply a coat of paint and nail it down. After that, the planning for the new track will begin. 

Sunday, August 2, 2026

4-4-0 Conversion Redux

 It has been a while since I have visited this topic. In my last post on the subject the body and tender had been completed and sent out for paint. To make a long story short, they never got painted and returned, so as a result I have had the conversion hardware in a box for the past 7 years or so.

 Recently I got another chance to perform this conversion, on a completely different locomotive. Since the last time I have learned some new tricks as far as the tender wheels are concerned, which was actually going to be the next topic on this subject.

I will be restarting the entire series as I am performing the conversion from the start, so unlike my last post on the subject there will be pictures this time. This post will not be a part of that series insofar as doing the actual conversion, it is more of a "more to come" sort of post for those who were interested in converting a locomotive of their very own. 

The normal method of completing the Nn3 conversion on a Bachmann 4-4-0 tender is to file and carve the constituent pieces of the existing tender trucks to narrow them to 6.5 mm gauge. However, anyone familiar with the Bachmann 4-4-0 knows that the weak point in the entire mechanism is, in fact, the tender trucks, and narrowing them doesn't improve them a single bit.

To put it bluntly, the tender trucks are mechanisms of pain and sorrow, created by evil hell-spawn out of suck and fail for the sole purpose of causing tears and sadness. To say they suck is to bring grave insult to vacuum itself. I am certain that some engineer who worked for Bachmann long long ago secretly hated N scale and wanted to see it fail, and this was his contribution.

The problem is they are not free rolling in any sense of the word. Sure, you can get the wheels to move on their poop-metal stub axles, but they don't free wheel, even after liberal applications of Conduct-A-Lube oil, and they cause so much drag that the locomotive can't usually even pull the cars in the train sets they came in. They sit on the tracks with their drivers spinning helplessly as the train sits like a stone or moves so slowly that it is barely moving at all. In spite of their traction tires, the drivers flail about, causing only violent vibrations to the locomotive body until it finally flings itself off the tracks in disgust. 2 to 3 cars is about all you can expect if you are lucky, and all of this misery is due to the horrid tender trucks.

Fortunately for us Nn3'ers, in the past seven years there is a newcomer to the Z scale scene, and their name is Rokuhan. What has that got to do with this? Simply put, they have created all-wheel pickup bogies (trucks to those of us in the US) that have the same sort of needle-point side frames as used on the Kato Mikado as well as the newer Bachmann steam locomotives. (See Bachmann? We know you can do better!)

These trucks are readily available by buying their SA003-1 non-powered type A trailer. This link goes to Z Track Center, which is where I found them for $15.75 plus shipping, and I have found that to be about the cheapest place to get them.

Note that there is also a powered chassis, which may be useful for other things. There are also knuckle couplers if you prefer to use them rather than installing body mounted Micro Trains couplers, which may be a bit easier for the 4-4-0 conversion. I already had the Micro Trains coupler installed, but the installation of the Rokuhan bogies raised the tender body up enough that I had to shim the coupler to put it at the right height. More on that in a bit.

These bogies can easily be modified to put pickups on Republic Locomotive Works Nn3 kit locos (if you can find them; an appeal to Monroe Models is in order here), and better yet, they will work on the Bachmann conversion. The side frames have to be sanded off so that side frames from the original Bachmann or Micro Trains arch bar trucks can be glued on, or you may be able to find 3D files that uses the contact plates and wheel sets; I know they exist. 

I have been working on a proof of concept on my sole remaining Nn3 4-4-0 and I have to say the results are promising. I just had it orbiting a 195mm radius circle of track with 7 EBT freight cars made from RLW kits (which are quite heavy for their size) and a narrowed Bachmann old-time combine, a task which usually left the poor loco spinning it's wheels.

As I mentioned, the truck replacement causes the tender body to sit up a bit more than the stock trucks, which means the locomotive chassis has to be filed a bit to keep the rear drivers seated securely on the rails. This also means the driveshaft is angled downwards from the tender to the locomotive, but this hasn't so far caused a problem even with the thick clunky driveshaft on my present model. If you are using the new and improves mechanism with the narrow driveshafts, this should be even less of the non-problem that I am having with mine (by the way, this new series will be based on the newer chassis, so there will be pictures of that).

All in all I'm excited to get started. Stay tuned! 

Tuesday, July 14, 2026

Progress Report 7/14/26

 A mixed bag for this report.

 Last time I mentioned how the Bachmann 4-8-4 has a magical ability to detect trackwork flaws. It still does.

I did change up the narrow gauge, installing a turntable in place of the Y. This did indeed give me the opportunity to broaden the curve going into the hill, which helped considerably. I didn't single-track the line on the hill though, instead I combined the sidings and built a 2 track main because that's a long stretch, and if I want to run trains in both directions I am going to need a way for them to pass each other.

I was a little concerned about the curve at the top of the hill, I didn't know if there would be enough separation for long cars to pass each other. I tested it with a couple of strings of autoracks, and they did not hit each other. I also tested with passenger cars, and they were fine as well.

However, I have run into another problem, one that won't be so easily solved. My benchwork structure is not working out. I have the basic frame built out of 1x2's in an L arrangement which works well. I then topped it with 1/8" masonite and topped that with 1/2" foam.

This was a bad idea. The masonite isn't dense enough to support itself, let alone the foam, between the frame crossmembers, and it is sagging badly. I have as much as 1/4" between stringers 2 feet apart, which of course means the track has the same undulations, and the aforementioned Northerns have struggles making it through the turnouts in that area. The biggest problem is the main from where the loop return ties in to where the curve is starting the grade, a total distance of about 5 feet, which is where this whole thing started to begin with.



My options are to take up the track (ugh) and fill/sand those areas, tear off the foam/masonite and replace the masonite with true 1/8 or 1/4 plywood, brace the area with 1x2 framework, or cut the affected mainline out completely and replace it with a piece of 1x4 hardwood. 

I'm not fond of the first option because there is nothing to prevent future sagging. I don't like the second option (although realistically it is probably the best one) because it would mean pretty much starting over. The third option would probably be the easiest because it wouldn't involve removing the trackwork, and is probably the route I will take. The fourth option is something I will explore if the third option doesn't work out like I want it to. 

And then maybe those darn Northerns will run on the layout.

As a side note, I have a picture of my track plan below. Maybe it will help to envision what I am doing. I should stress that it is definitely not to scale, the yellow loop is smaller than in the picture and the tunnel portals on the yellow loop will be side by side. You will also note that 1) the yard to the left is completely un-designed at this point and 2) the narrow gauge is not shown. You may also note the layout is broken into blocks to facilitate the DC operation option, although at present all the blocks are wired together for DCC operations.


 

Sunday, June 7, 2026

A Few Simple Repairs

 Yesterday, for a brief shining instant, trains were running on the Nodaway Valley Railroad.

Yes, I finally got the final track wiring accomplished and then I ran some trains. I found a dead piece of track that needed feeders and a few turnouts that needed to be tuned up, but I was able to run a cleaning train around a few times.

I then broke out the Bachmann 4-8-4 locos. These are almost magical in their ability to find flaws in trackwork, and boy did they find them. A few of the issues were due to wheel guage, which was quickly fixed, but two (three) major issues were soon found to be a problem.

Due to my desire to have a turning Y for the narrow gauge, I created a stretch of dual gauge trackage approximately 5 feet long. This dual gauge trackage led eventually to the coal processing plant where it turned back into a standard gauge yard. Due to the placement, the main line was forced into a tighter curve, 12" where originally 15" was planned.

On the beginning of a hill.

So two model railroad no-no's in one short stretch of track.

I made the decision this morning to tear out the dual gauge and replace the Y with a narrow gauge turntable, which means I will have to purchase and modify another Peco N scale turntable for that end of the narrow gauge. This will allow me to broaden the standard gauge curve going into the coal plant (thus eliminating another future headache), which allows me to install the 15" curve on the main that I wanted in the first place.

Still on a hill, but at least the broader curve will be less of an issue.

In the process I will be eliminating a siding that I had installed for a joint train station for the standard and narrow gauge railroads, but I won't miss it. This gives me an additional opportunity to smooth the vertical transition more than it is, which eliminates another issue since the vertical transition was co-located with the beginning of the curve.

You can see why I had issues there.

While I'm at it, I am going to eliminate the two passing sidings on the hill. I had added them in as an afterthought, one on each incline, and the turnouts are problematic because of the vertical distance the throwbar actuator had to travel. 

The Northerns had problems with derailing their pony trucks on these turnouts, and since I don't really need them they can go away. This will also give me some room to put scenery on the wall next to the incline since there will only be one track instead of two.

I will re-test the mainline when these repairs are complete, and I'm expecting better results.

Wednesday, June 3, 2026

Starts and Stops

Thursday I was supposed to get a visit from the plumbers to do some major work. They had to beg off, so instead I tackled the wiring on the layout (which I was going to do regardless, since I wasn't going to irritate the professionals).

After eight hours of continuous labor, I was able to get blocks 1 through 4 and 6 through 11 wired from the track to what will become the control panel connector. In a real sense that means the main part of the standard gauge is done; all that is left is the mountain loop (block 12), the dual gauge section (blocks 5 and 14), and the coal washing plant yard (block 15).

The mountain loop is one continuous run with one siding (block 13). I will have to wire about three drops for the continuous section, but the drop for the siding is done. Two dual gauge turnouts have to be built and installed along with the rest of the dual gauge track before the coal plant standard gauge yard can be laid and wired. 

The common rail has continuity all the way around the standard gauge section, and the common rail for the coal plant yard will be wired into this continuous section. The common rail for the dual gauge section, however, will be wired through a switch so that it, along with the dual gauge approach block can be switched between standard and narrow gauge.

I haven't even begun to attempt the yard design. It occupies a blank section on my layout map labeled "Here Be Dragons" beyond the two turnouts that will lead to it. Whatever it ends up being, it will occupy a 28 inch by 8 foot section of bench work that has already been built. The narrow gauge portion at least has a solid plan, but it will have to wait until I complete the rest of the standard gauge section. Time will tell which of these sections (yard or narrow gauge) will be built first. 

One day I will take a picture of my doodles so that you can see what blocks are where and how they connect, but today is not that day.

Thursday, May 14, 2026

Layout Build Progress Report 5/14/26

Work continues on the railroad today.

I was on vacation the first half of the month, but before I left I managed to get the last piece of track down on the Nodaway Valley (standard gauge portion) Railroad. All of the track work, turnouts and Tortoise switch machines are installed and tested. All that is left before scenery can be applied is wiring.

My goal today is to get all the common rail wiring complete, then get the block rails wired to terminal blocks. After that I'll have to build control panels so that the block rails can be wired to block switches and the Tortoise switch machines can be connected to their control switches. My plan is to be able to switch control systems from DC to DCC, the same as I could do on the last layout.

I am using Digitrax DCC on this layout because I have it, and if I program my locos on the Digitrax they will run the same at home as they do on the club layouts. I have a Cooler Crawler kit to put together that I will use for DC power. Along with the kit are throttles, and if I am seeing things correctly at least one of them is a radio throttle. I guess I will see when I build the circuit.

Once I can get the wiring complete I will run some trains for a while to verify everything is working the way I want it to, and then I will start on the narrow gauge Path Valley Railroad. I have turnouts to build and control systems to figure out. I want to use servos for the turnouts, controlled by Arduinos, so that I can set up an automatic continuous operations loop for when I want to run locomotives for break-in or just to run them around like fish in a bowl. 

That will take some figuring out because what I will have is a loop-to-loop on the Scenic Ridge layout with a branch line to the coal processing plant and dual gauge interchange. I want to be able to control them all individually for normal operations or switch to the automatic operation on the loop-to-loop and lock the branch line out for continuous operation.

And now the plans have been made, I need to get started. 

Thursday, February 5, 2026

New Acquisitions

 I have upped my NS Heritage Unit count by two. 

 Sort of. 

Let me explain.

The first is a Monongahela ES44AC. I wanted this one because the Monongahela ran through Waynesburg PA where it had a connection to the narrow gauge Washington and Waynesburg. All of the narrow gauge is gone now, with no sign of remains, but the Monongahela main is still used by the Norfolk Southern (and occasionally CSX) to access coal mines in the area.

The second is a fantasy paint PRR ES44AC in Brunswick Green. The actual PRR Heritage unit, number 8102, is Tuscan Red. This foobie unit carries the number 1846, which is actually carried by an SD70ACC on the Norfolk Southern. The number 1846 on this unit is likely - almost certainly - due to the establishment of the Pennsylvania Rail Road on April 13 of that year. As such, it really isn't an NS heritage unit at all.

At any rate, the first thing I did when I unboxed them was drop the Monongahela unit on the floor and bend a wheel. Unfortunately, since they are Fox Valley Models locomotives, there is no manufacturer support. Fortunately (but not really surprisingly) the Kato 6 axle diesel wheel sets are a drop-in replacement. In fact, the entire truck is a drop-in replacement, but I only have gray ones on hand and the ones on the locomotive are black.

At any rate the damage was quickly repaired using my stash of Kato spare parts and both locomotives were put through their paces. The PRR unit programmed with no issues, but the Monongahela unit is slow at the top speed, only able to achieve 118 SMPH. It is still faster than the Southern unit, which tops out at 105. I have programmed CV5 on both locomotives to achieve the same speeds at 5% increments up to their top speeds, so they will run with the other locomotives on my roster. If it bothered me overly much I would replace the motors with Kato units and make rocket ships out of them all. 

This brings my total number of NS Heritage units up to four (six if you count the Kato Erie and the foobie PRR): Erie, PRR, Monongahela and Southern. I want to find a Norfolk Southern (the original NS, not the current one) and a Norfolk and Western and then I think I may be done.

Monday, February 2, 2026

Progress

 We have had  winter storms for the past two consecutive weekends. The weekend of January 23rd we had an ice storm that dumped freezing rain and sleet on us, followed by a week of sub-freezing temperatures overnights that kept the ice around for a while.

All told it wasn't as bad as it could have been. We got about a quarter inch or less of ice, we never lost power, and I was able to clear the driveway and sidewalks during the daytime before it could re-freeze, so all the ice that was left was on the grass.

This past weekend we got powder snow. We were forecast to get between 5 and 7 inches, but all through the day we were in a snow-free corridor that stretched from South Hill VA south to the coast between Wilmington NC and Myrtle Beach SC. When the corridor finally closed, like a zipper from north to south, we ended up getting about 3 inches or so. Since it was powdery snow I was able to clear it from the driveway and sidewalks very easily.

What that means is I had a lot of time to spend on the railroad. The benchwork has been completed for a while now, but it was covered with construction materials and tools. Last weekend I got it cleaned off, so this past weekend I was able to get some track planning done and put some cork down.

My new layout is going to have four distinct sections. The yard will be along the north wall to the left as you walk in the door. The Nodaway Valley section is along the east wall and the track plan is basically what I have on my 2x8 layout right now. The coal washing plant will be on the south wall and will have standard, narrow, and dual gauge. Finally, the narrow gauge Path Valley section will be on a peninsula jutting out from the west wall. In its entirety the layout will be in a reversed G shape. 

I have almost all the track planning done.. The only thing left on the standard gauge is the yard which I still haven't decided what to do with. I got the cork entirely laid down on the Nodaway Valley section this weekend, including the turnouts to the yard at the north end and the coal washing plant on the south end. 

The lead to the coal washing plant will be dual gauged so that it can be used as one of the legs of the narrow gauge turning wye. This will require the building of five dual gauge turnouts, including a curved one that will have to be built on site. I'm thinking of building them all on-site so they can be code 55 rail instead of the code 40 that is used in the Fast Tracks dual gauge jig. I also have a handful of narrow gauge turnouts to build, but I can use the Fast Tracks jig for those since it is for code 55 rail. The rest of the track work will be Peco Code 55 for both standard and narrow gauge sections.

I have the narrow gauge Path Valley track plan almost all figured out as well. It is being built as a heavily modified Woodland Scenics Scenic Ridge layout. I have single-tracked the hill section between the loops and as such I have created two turnaround loops, which will require some special wiring. The only question left is where I am going to put the turntable and round house.

I have a Peco 6" turntable that I am going to modify to narrow gauge, and I have an old wooden kit for the Nevada Northern roundhouse. I have the kit for the two added on stalls as well, but I don't think I will have the room for them. I have just about decided that it will go in the lower right corner as you look at the plan on paper. There should be just enough room for the turntable and the four stall roundhouse.

I am going to automate some of it using an Arduino to control the loop turnouts. To further complicate things, I am also going to automate the turnout leading into the turning Y at the coal washing plant. There will be a sensor on each loop and one on the wye that will cause all three turnouts to change as the polarity on the main is switched. I will be able to run it as a point-to-point from the coal mine on the upper loop to the coal washing station wye and back, or as a continuous run around the upper and lower loops.

I am waiting on insulated rail joiners for the Electrofrog turnouts, and then I will be able to lay some track. That might be a while though because I have the show in New Bern coming up this month on the 21st and I have a couple of modules that need attention before then.

I don't know how much I will be able to get done during the month of February, but my workplace will have a shut-down in March, so (depending on whatever plans The Management has) I should be able to get some more done then. I would like to get some track laid this month, and maybe build some turnouts as well.

If it all works the way I have imagined it, it should be awesome.

Tuesday, January 27, 2026

Watch Your Speed

 I have been busy speed-matching locomotives.

First, I speed matched everything on my NCE system and found that they didn't perform the same on the club Digitrax setups. This is because the two systems put different voltages on the tracks, which is irritating but not unrecoverable.

Second I noticed that locos I thought were speed matched were, in fact, not. Generally speaking I try to match them at 50% and 99% (Digitrax doesn't go to 100%) at 65 SMPH and 120 SMPH* respectively, and set CV2 to zero and live with the results. This works well with most of my locomotives, but I found that some locos I thought were programmed to these speeds at these throttle settings were way off. Locos that I thought were set to 65/120 ended up being set at 40/75 instead.

The only thing I can figure is I had the speedometer set to K PH instead of M PH, which would throw the readings off to the degree I am experiencing (roughly 1.6 kilometers per mile). So I have a bit of Unitrack set up on the new layout (I have the benchwork complete and am working on track plans) and I have verified the speedometer is set to MPH instead of KPH, and I have started from the beginning.

So far everything is going pretty well. Kato and Atlas locos were very easy to verify and program where needed. The Fox Valley Models locos are somewhat slow, and one of them tops out at 105, so I just programmed it to keep up through the speed ranges until its top speed was met. Much to my surprise, though, the LifeLike GP18 and GP20 locos were difficult. 

The Life Like GP20 is one of my favorite locomotives, and I have eight of them. I have three GP18's, only one that I run regularly in consist with a triple set of N&W GP20s. They were all set to 40/75 when I put them on the track, and at first I couldn't get them to reset when I changed CV's 5 and 6. 

I finally had to program CV6 to about where I wanted it and then step CV5 up by increments in order to get any effect. I finally did get the GP20's all done (with the exception of two holiday locomotives that will be done later) and the one Southern GP18, but it was more trouble than I expected.

TCS decoders continue to have hesitation issues on my Digitrax system, something that no one has been able to explain, and the GP18's and 20's are all TCS equipped, which may have been a contributing factor. I love the slow speed control of the TCS decoders, but the hesitation to respond to throttle changes and the occasional refusal to play nice with Digitrax DCC systems is an irritant..

I have a couple of Life Like GP18's and 20's left, a quartet of FA and FBs that I will likely not bother with (they run really slow but they are a set), a bunch of old Atlas/Kato RS locos, one each Atlas SD7 and 9, an Atlas/Kato SW1500 cow/calf set that I may not bother with, and a pair of Bachmann sound equipped SD9 locos left to go. 

The Bachmanns run slow so I will only program them to keep up with the others to the top of their speed range. This is somewhat surprising as well since their non-sound equipped locos are rocket ships, and since CVs 5 and 6 are non-programmable on the non-sound Bachmanns there is nothing short of changing out decoders (that would have to be wired in because there are no drop-in decoders for Bachmann GP7's that I know of) that you can do about it.

And after that... we will start in on the steam. 

*Yes, I know prototypical top speeds for diesels are generally in the 65-70 MPH range, and yes I could program everything to 35/70, but running scale speeds on show layouts for the public seems really slow, so the public loses interest in watching them run. I have been considering setting them to 50/99 to match the Digitrax throttle percentages.

Sunday, December 7, 2025

Layout Build Progress Report: 12/7/25

 Work has progressed on the layout, even though I haven't been documenting it as I should.

I have all the benchwork done. The framing is done out of 1x2 L girders, topped by 1/8" Masonite, topped by 1/2" foam board. The Woodland Scenics kit that I am building the narrow gauge on is likewise mounted on a 1x2 frame topped by 1/8" Masonite to give it a bit of strength. I tried it without the Masonite, but it was very flimsy in the middle.

I initially set the height for the layout at 54", but I have determined that the layout is just to tall to be accessible at that height. I lowered it to 45" at the base, so with the framing, Masonite and foam the top of the tables are right at 48". This is just about perfect, I can get to everything and it is still tall enough to give a good viewing angle and provide plenty of storage space underneath, as well as being at a good height for me to work on the wiring side while sitting on my roll-around stool.

Now that the tables are done I can start my track planning. So far I have drawn the turnaround loop at the narrow gauge junction end of the layout and cut the hole in the middle for access when I get the tunnel put into place. I will sit down later and draw it all out in SCARM so that I can attempt to plan the rest of the trackage. I don't know if my coal cleaning plant is going to work out or not, but I'm certainly going to try my best to get it in.

I still don't quite know what to do with the yard, either. I have two possibilities, a single yard that will have a Y connection or a side-by-side double yard that will only be connected at the turntable. The second method will be much easier to wire, seems to make better use of the space, and will give me a point-to-point operational option, so I'm leaning that way. The only problem is working the back yard will mean reaching over the front yard, which isn't really ideal.

I'll have to mock up my roundhouses and turntable to see what will work best. I have two "new" (as in un-built) Walthers/Heljan/ConCor Union City roundhouse kits, along with a Wathers/Heljan/ConCor 130' non-powered turntable and scratch-built roundhouse from my old 4x8 layout. The railings on the bridge of the turntable need to be rebuilt because they got broken during storage, and I don't know if I will use the scratch-built roundhouse or not. I'm leaning towards it because it has two stalls long enough for a J class or a 4-8-4 Northern locomotive, but it doesn't have anything like the same footprint as the kits.

If I do use it I'll have to build some doors, because most of the ones I had on it are missing. I can't remember if I had doors on all the stalls or not, I don't think I did. If I use it I'll have to squeeze it in, but it is closer to the turntable than the kits end up being so I think I can get it to fit OK. When I can get the construction materials cleared off of the benchwork I'll start laying things out.

Between now and Christmas I'll be going through all my kits and such, determining what I'm going to use and what I'm not going to use. I also want to organize everything so I can get my workroom laid out, then I can put some shelving in and I will finally have storage space for my modules as well as a place to work on them. I know The Management will be happy to see me get my "junk" out of the common areas.

It's been a long time coming to get to this point, mostly delayed by inertia, but now that I have a head of steam on I plan to get some things done this winter. I'll be back to work tomorrow so I will only have my days off to work on it for the next two weeks, but then I'll have two weeks of vacation from Christmas to New Year, so I plan on getting some things done then. 

We will see how well the plan resembles reality. 

Tuesday, November 11, 2025

Blunami! Pt 3

I said I was going to show the installation on a Bachmann J class, but I got into a bind and didn't have the time to take any pictures. I also installed one in another ATSF 4-8-4, and the only thing different about it from the previous installations that I have already shown is the size of the decoder, which I will show later in this post.

I had one of the old type Bachmann J classes that I was trying to get running for a friend, and he was considering putting a decoder in it if I could get it to run decently. It had the dreaded split gears, and I had found some 3D printed gears, but the old chassis just doesn't run well. I told him that I could put a decoder in the old crappy B-Mann chassis J, but it would never be a great runner. I might possibly get it to be an adequate runner, but given the limitations of that chassis that was about as good as it was going to get.

However, there was a guy selling one for a really really good price, and I bought it. I told my friend that I would pass it on to him for the same price as I paid for it, and I could try to work with the old one but the new one is miles and miles superior to the old one and for the price he would be an idiot not to go that route instead. Of course he agreed with me.

It was supposed to have an ESU decoder, and it did, but when it got to me I found the tender top had a hole cut in it for the cube speaker and the speaker sounded like garbage. So, I ordered a new tender shell and some speakers of the correct round type for the loco and traded him that one for one that I had on hand that had a Tsunami 2 TSU-1100 installed in it. 

This was a loco that I had picked up really cheap at a train show (cheaper than the "new" one that had just arrived, in fact) because it didn't run (a bit of Kapton tape on the chassis fixed it right up). I traded shells on the locos (my old one was 601 and the new one was 611, which is the one he wanted) and waited for my parts to come in.

When the tender shell and speakers arrived it was quick work to swap them out. Bachmann really hit it out of the park with the Spectrum J class locos built after 2005, and installing a sound decoder consists of removing the tender shell, removing the PC board just enough to slip the 15mm round speaker into the pocket made for it, reinstalling the PC board, and soldering the decoder in to the tabs built on the PC board for just that purpose.

Of course for this one I had to remove the old speaker and ECU decoder first, but once that was done and the old solder removed from the board the new installation went as expected. As I mentioned before, while I was at it I installed a Blunami BLU-1100 in the last of the three 4-8-4's I have, too, so now I have four 4-8-4 locos (three ATSF and one J class) equipped with Blunami decoders.

I do have a photo of the two decoders side-by-side to show their relative size. As you can see, the 1100 is about the same size as the TSU-1100 so if the TSU will fit the BLU will fit, too. As you can imagine, there is much more room in that 54 foot 4-8-4 tender for the speakers as well when using the 1100 rather than the 2200.

The best thing about having the Blunami decoders installed came about this past weekend when we had a train show. All of a sudden, about an hour before the show was to end, the wifi went wonky and the Engine Driver app that everyone uses on their cell phones stopped working. What that meant was, if you didn't have a Digitrax radio throttle you were done running trains. Unfortunately we were contracted, as it were, to run trains right up until closing time.

I killed the Engine Driver app and pulled up the Blunami app and right away had a pair of trains running. A couple of our other guys had radio throttles, so all four of our NTrak layout tracks were occupied until the end of the show. The 1100 runs just as good as the 2200, sounds just as good, and fits a lot better into smaller spaces.

To say I am pleased with these decoders is an understatement. I have four of these 1100's, two of them have been installed and I plan to replace the two 2200 decoders in the 4-8-4's that have them with 1100's instead.

And then I will have a grand total of four steam 2200's... and I have four HO scale steam locomotives...

I also just purchased a BLU-2200 for EMD diesels, since I have an HO scale GP7.

It looks like my HO scale layout will be DC powered with no blocks. I'll probably use a dedicated 15VDC power supply for it rather than hook any sort of throttle up to it, so it won't even have a control panel, just an on-off switch. I will manually throw turnouts so I won't need power for them, either. That should make things really easy.

And now all I need to do is build some benchwork...
 

Monday, November 3, 2025

Blunami! PT 2.5

 Once upon a time I told you about installing Blunami BLU-2200 decoders into a Bachmann 4-8-4 steamer. As you may recall, I picked the Bachmann 4-8-4 because it has a big tender, big enough to fit this HO scale decoder and the two speakers required for the 2W output power rating of said decoder. At the end of that post, I expressed a hope that they could be downsized for N scale.

Well... someone at Soundtraxx must have been listening, because the BLU-1100 has now been released! 

As soon as I knew they existed, I jumped online and ordered some. Unfortunately they were back-ordered, and even now at the time of this writing they are listed as "out of stock" on Soundtraxx's website.

BUT! I just got an email saying they have been shipped! I should have them in my sweaty paws very soon, and as soon as I do we will have a comparison and another installation post, this time on a Bachmann Class J. 

Saturday, October 11, 2025

Rises And Elevations

The first part of the benchwork has begun.

I made some L girders out of 1x2 and fastened them to the wall at 30 and 51 inch heights. The 51 inch was necessary to clear the light switch of all things, but that's about where I wanted it anyway, and the 30 inch is perfect for a table-top height HO gauge layout.

Or so I thought.

The first real bit of benchwork I built was a 3x6 foot platform for the Scenic Ridge layout that I am going to build as Nn3. It, too, is built from 1x2 strip wood, and with the foam on it measures right at 2 3/4". At 51 inches from the bottom, the top of the platform with the Styrofoam sheets attached is just under 54". That should be fine as long as I don't have any problems at the back of the layout, assuming I will have the long edge against the wall. 

Which you know I am going to, for no other reason than it will be difficult to reach at that height.

 Added to that is the fact that the entire layout isn't built at foam level, oh no. There is a 2" riser that goes on the top of the base board that sets track height, and then a 4% incline that adds another 2" before it's done. Because I'm building this in Nn3 I may be able to get by with substituting the 4% incline with a 2.5 or 3%, which will only raise the track another inch and a half. Still, that would be a 3 1/2" maximum track height, added to the 51" bottom height, added to the 2 3/4" base height, which puts the highest track elevation at 57 1/4" from the floor and almost 3 feet from the front edge.

Yep, I'm going to need a ladder to get to the back of the Nn3 layout. But it will look spectacular at that height.

Due to this, I'm considering putting the HO layout on the adjacent and opposite walls, which will put it under the widest part of the standard gauge layout instead of under the narrow gauge, where it would impede access to the back of the Nn3. I'm also considering a 3" difference in height between the standard gauge and narrow gauge sections, which would be about a 2.5% grade along the 10 foot wall, which is completely possible and would add a little interest besides.

I'm also considering sticking the Nn3 out from the wall, which will extend it six feet from the wall. At a 10 foot 10 inch room width, that would leave 4 foot 10 inches for the main section of the standard gauge and an aisle. Figuring at least 24" for the aisle leaves a 2 foot 10 inch bench depth for the standard gauge. This does give me enough room for a 15" radius turnaround loop for the standard gauge, especially if I consider curving the front of that section towards the wall. 

That would also allow me to put the grade along the same wall as the Nn3 layout will stick out from, which will not interfere with the turnaround loop on that end, and would also give me a nice level spot for the interchange yard on the layout spur going to the narrow gauge (which will be standard gauge... maybe... or maybe it will be a coal washing plant with the narrow gauge climbing down the grade to get to it.).

So many possibilities... but that's why I built the base for the Scenic Ridge layout first.  

Wednesday, October 8, 2025

Let The Fun Begin

 I have finally completed renovations on the train room. Mostly. Except for some trim work that isn't really important right now.

At any rate, that meant that trains must run in the new train room!

I am kicking around several plans, but one of the things that I have decided will absolutely happen is dual scales. Maybe even triple scales. I will have an HO layout, an N scale with Nn3, and for the third, the Nn3 may get the option of removable buildings so that it can become Z as well.

The only question is where to put the HO. I have debated putting it above the N, but I think I have decided to put it below. The HO will be at 30 inches (basically tabletop height) and the N will be at 54 inches. The HO will be tucked under a portion of the N that has very little operational requirements, so reaching over the HO to get to the N won't be a huge problem.

I decided on these heights so that I can operate the HO from a chair and the N will have enough room under it for the 48" high racks I have built to put my equipment cases in. The N was only going to be a foot deep at this point, but it will now be two. The tracks will be at the front and more space for scenery will be towards the back. This also gives me more room for the interchange for the narrow gauge branch.

Anyway, I needed to plan the benchwork, so the first trains to run in the new train room was HO. I set the track up and wired up the Empire Builder Digitrax DCC system that Mrs Hades got for me. As you may recall, I attempted to go wireless with that one and failed miserably. It worked with wired throttles, though, so I built some buss cables to run to the track, plugged in the throttle... and nothing. Everything SEEMED to work, the throttle showed the locomotive was selected, there was power on the tracks, but the trains did not respond to the throttle. They all made their normal background sounds, but none of them moved, and none of the throttle commanded sounds or lights worked.

To say the least, I was extremely discombobulated. I knew it wasn't going to work with the wireless throttles, but I decided rather than mess with it I would just swap out the DB150 from the Empire Builder with the DSC210 from the Evolution Express system that I just bought. To save some time hooking more things up, I just used the plug in throttle again instead of plugging in the UR93 duplex transceiver and putting batteries in the DT602D... and this time it worked perfectly.

This makes me question the problems I had with my previous DT402D wireless throttle. Since it worked when plugged in, and occasionally when unplugged, perhaps the problems weren't with the throttle, but with a failing, but not quite gone yet, DB150? Maybe there was nothing wrong with it after all, and I didn't waste my money on it, and it will work with the DSC210? (Or with the Zephyr, which can be used as a command station with other throttles/wireless devices connected by LocoNet, which is another thing I should have tried.)

I haven't had the time to mess with it yet, but the next thing I will do is hook up the UR93 and see if the DT402D will work with it. (NOTE: It does, so now I have two functioning radio throttles.)

Wednesday, September 24, 2025

The Fitzgerald Locomotives

Once again the Cotton Brute is in my possession. This time it requires no repairs. Instead, it is being operated, possibly for the last time (at least for a while), at the Danville Rail Days event in honor of late NRail President John Wallis. John had decided to retire the locomotive due to its age and relative fragility to prevent it being damaged or lost. It was destined to be put on display at a place yet to be determined.

As you may recall, Cotton Brute was restored for the NRail 50th Anniversary celebration that occurred in 2023. The refurbishment was done at the direction of President Wallis in late 2022 and the restored and updated locomotive was run for the first time at the Danville Old 97 Rail Days (Danville has since dropped the “Old 97” designation) event in 2022. It seemed only proper that she should make her last appearance there before being retired.

But this story is not about that locomotive.

Along with the Cotton Brute, Jim Fitzgerald also built two other locomotives; Cotton Boss and Cotton Beast. The current whereabouts and disposition of Cotton Beast is unknown, but Cotton Boss is now also in my possession.

When I asked current NRail President Andy Zimmerman about the possibility of featuring Cotton Brute at Danville, I also recalled that John had mentioned having Cotton Boss for possible restoration. I asked him about this project and he replied that he did not know what the condition of the locomotive was yet, since both Beast and Boss were in possession of one of the club members helping the family sort and process all of John’s extensive collection.

Contacts were made, appointments were set, and both locomotives ended up in my hands. Cotton Brute was briefly tested to ensure its operability, and I finally set my eyes on Cotton Boss for the first time. The intent was to evaluate the condition of the locomotive for restoration and repair.


What we found was promising. The construction of the Boss is radically different from the Brute. Just like the Brute, the center section of the locomotive has been custom-built, but as far as I know there isn’t any depleted uranium in its construction. 


The ends of the locomotive are from a donor chassis, tapped and drilled to accept a series of screws holding it into the custom built center section. The trucks on this chassis are 4 wheel, not 6, so unlike the Brute the donor was not a U30CG. I suspect they, and the chassis ends, are from a Minitrix F9; the construction of the trucks, complete with the finger wipers at the truck ends, certainly suggests they are, but the rest of the mechanism does not exactly match photos I have found online. The Minitrix F9 is the closest I have been able to find, and it would only make sense that the trucks are from the same donor as the chassis ends.

The top of the locomotive consists of a series of three plates; two short ones on each end for spacers and one long one across the top that holds everything together and also holds the Sagami can motor in place. The locomotive ends slip over the center section that includes the tank in its construction. The inner two screws fasten the top plate to the center section. The two short plates are fastened to the end pieces and the long plate is fastened to the short plates with the two outer screws. The Sagami can motor hangs from the top plate with two screws, but in an interesting arrangement there are three set screws in a triangular formation that are used to adjust the motor orientation. This is necessary because there are no drive shafts; the ends of the motor shafts are fitted with one coupler end that fits into the other coupler end attached to the end pieces. There is no play to this arrangement, either it is right or it is wrong. I suspect this rigid requirement is the cause of what I found next.

The ends of the locomotive were loose and had quite a bit of movement. It was a quick job to remove the outer screws from the top plate, and the ends with the shorter plates attached slid out of the assembly. The short plate screws were then tightened down and the now solid ends were reattached to the center plate, making the entire chassis solid once more. It is my belief that if the motor is even slightly out of alignment, it will cause a vibration that will loosen these screws over time.

The wheels were cleaned and the mechanism lubricated, and then the locomotive was placed upon the rails of my humble 2x8 foot oval layout. Power was fed to the rails (DC only) and for the first time in who knows how long, the mechanism moved. I ran it several times around in each direction and it performed flawlessly. I did note a bit of vibration, indicating that perhaps the motor alignment could use some adjustment, but this was beyond the scope of my investigation so I left it alone.

I searched through the N Scale Locomotive Encyclopedia (I am ever grateful for this fantastic resource) and determined the shell is from a Lima FP45. This model did not have porches molded to the shell, they were instead a part of the chassis. The sides of the shell do not completely cover the chassis so about an eighth of an inch of the chassis shows beneath the bottom sill of the shell. There was the remains of one porch, without a doubt from a Minitrix U30/U28 due to the similar appearance to the Cotton Brute porches, that looks as if it was attached to the bottom of the shell. Glue remnants on each end of the shell indicates there was a porch on each end. The porch pieces were reassembled and re-attached to the front of the shell.

Amusingly, in the same box, were the missing air tank end pieces to Cotton Brute’s tank. As you may recall, those air tank ends were replaced with solid ends because donor air tank ends could not be found for the one end that was missing them. They are un-needed now, but it was interesting to find them in the box nonetheless.

President Zimmerman was apprised of the condition of the Cotton Boss, and I received the clear signal to complete the cosmetic restoration. I have the parts to replace the missing porch and end railings and refresh the paint on the tank, but since the Boss will likely not see any operational service she will not receive any of the mechanical upgrades that her more famous sister did. It will instead be restored cosmetically while her mechanical components remain operational on analog power only.


The restoration will, of course, be documented here. 

Saturday, July 19, 2025

Gutted

 Of all the things I had on my mental bingo card today, this was not one of them.

 I just opened the following email about ten minutes ago from the President of the North Raleigh Model Railroad Club:

"I am very sorry to have to share the news that we have lost a good friend, mentor, leader, and a pillar of our club with the passing of John Wallis last night.  We only have limited information so far from John's son, but by all appearances he passed peacefully in his sleep last night.  

I have known John for 22 years and some of you for much longer than that.  I will miss his kind nature, quick wit, our Hurricanes hockey conversations, his encyclopedic knowledge of railroading and everything related to model railroading, and his eagerness to share all of that knowledge with anyone who was interested.  

Our club will absolutely miss the person who was a constant leader since 1980.  Whether he happened to be serving the club as an officer or not he was always the person who stepped up when something was needed and kept the club moving and growing.  

When we have more information to share about any arrangements, I will pass that along to the club."

John was also the President of NRail, and he was the one that arranged for the restoration of the Cotton Brute for the 50th anniversary of the founding of that organization. He was a mainstay in the model railroading community, and N scale in particular owes a great deal of its popularity to him.

We have a show this weekend. I just saw John on Friday as I was helping to set everything up. I didn't go today because I was doing things around the house. It won't be the same to not see him tomorrow.

Rest in peace John. Thanks for everything. 

Tuesday, July 15, 2025

The Trouble with Digitrax, PT III

 In two of my previous posts, I detailed some issues I had with Digitrax DCC systems.

To sum up, I prefer my NCE PowerCab for daily operations due to its simplicity and intuitive ease of operations. The problems I run into with my NCE are that it doesn't play nice with TCS decoders (which I use exclusively in my older Atlas locomotives) and when I program on the programming track I lose some cab parameters and have to set the cab back up. These issues are annoying, but minor, so I've decided to live with them, although one of these days I will likely send it in to have the cab parameter problem looked at.

The Digitrax Zephyr starter system is likewise easy to operate, especially for someone just transitioning from DC. I own the oldest of the sets, the DCS50, which has since been replaced by first the DCS51 and then the DCS52. They all have a single knob that you turn for engine speed, and a lever for forward and reverse, just like a DC throttle pack would have. The only difference is the keypad, which is used to enter the locomotive address and operate the functions as well as programming locomotives.

The problem is that the DCS50 doesn't show throttle settings in steps or percentages, so it's nearly impossible to set two locomotives to the exact same speed setting for speed matching. Also, the Digitrax systems as a whole don't seem to be as user friendly when programming locomotives as the NCE system is. The Zephyr is somewhat easier, but it's not easy to program advanced features since it is, after all, a basic starter set, as well as being very old. I'm sure that the newer versions are better; the DCS52, for example, has a larger liquid crystal display screen that shows much more information than the DCS50's sectional LED display.

However, since my club runs Digitrax, I have to program my show locomotives on that system due to the difference in track voltages between the two systems. Locomotives speed matched on NCE aren't necessarily going to be speed matched on Digitrax, which causes operational difficulties on show layouts. Therefore, I needed a more capable Digitrax system for programming, and to that end I purchased a Super Empire Builder Xtra, or rather had one purchased for me.

I had been using it successfully to program my locomotives, but one day I decided I wanted to run cordless operations. To that end I purchased some used throttles and interface panels, none of which have worked the way I wanted them to. To further complicate things, I hooked the Digitrax up to a loop of track to program my newest locomotives and, due probably to operator errors on an unfamiliar system, failed miserably, and had to program them with the NCE system (which, for reasons I have already extensively detailed, won't work so well on the club layout).

That brings me to this; a set of locomotives I couldn't program properly, a set of throttles that are virtually useless, and no way to run wireless if the cell phone setup doesn't work for whatever reason. So, finally, in desperation, I have made a purchase of a complete new Evolution Express Duplex Radio Starter Set, which should include all that I need for wireless operations as well as providing the proper throttle to run at the club shows.

I have almost decided that my new layout, which will be about 3 times bigger than my existing one, will use the Digitrax system because I now own so much Digitrax equipment. Digitrax did do one thing right in that all of their systems will work together with Loconet, so I can set both the original Zephyr and the DB150 from my Super Empire Builder starter sets to be boosters. 

I can use the Zephyr exclusively in the yard as the hostler's throttle and put the DB150 over on the mountain turn-around loop, sprinkling the various control panels around the layout and installing the LNWI module for cell phone ops. That should give me plenty of operational flexibility, and I should be able to use all of my throttles on IR if nothing else (I would have to purchase a UR91 interface panel to use the radio function on the 401R throttle).

I will then keep the NCE system for the Christmas layout and for various smaller projects that I may decide to get into. I have also almost convinced myself to build an HO layout on a shelf above the N, so that would be a perfect use for the NCE system. I would have to use a stepladder to get to the rear of the HO scale layout if I decide to build it, but that's a minor concern. It would also give me a nice place to mount some lighting for the N scale.

But first, I have to get the train room ready to build benchwork, so I'm off to do that now. 

Thursday, July 10, 2025

Scheduled Delivery

Three more modern locomotives, an AC4400CW, an SD70Ace, and an SD90/45MAC, all in Union Pacific paint, are scheduled to arrive today.

I don't know why I'm doing this to myself. At this rate my modern diesel roster will soon outnumber my steam roster. 

Sunday, June 22, 2025

Observation

 Drywall finishing work is a lot like modeling. You spend a lot of time waiting for things to dry.

Where the closet wall came out there is a lot of variation at the joints where the old closet wall meets the old room wall. On one side the door frame occupies much of that joint, so the variation is not as pronounced. Just above the door is worse, but not really so bad.

On the other side of the room, however, the surface of the room wall stands about a quarter inch proud of the surface of the closet wall. To make things worse, the drywall on the room side is crumbling along that edge, so it isn't firm against the wall studs in that joint area.

To remedy (but not really correct) it I am sanding the room wall down into the plaster about an eighth of an inch at the edge, feathering out six inches or so. I will then build the closet wall out about an eighth with drywall mud to match the sanded surface, feathering that out six inches or so as well. When I am done I should have a 12 inch surface, six inches on each side of the seam, that gently transitions from one surface to the other. 

The wall will never be straight all the way from corner to corner, so my goal is to simply smooth the transition and then I can disguise it with benchwork and scenery. In order to get it done, however, I am having to drive or pull nails and sand about 2 vertical feet of the wall at a time along the seam and then fill with drywall mud. Because the mud is so thick it takes a long time to dry. I will then have to sand that down, fill in the low spots, let that dry, sand it smooth again, and repeat as necessary to get that smooth transition. 

I expect this will take a few weeks on the days that I am not working. Fortunately there is still much to do while the wall dries, so that time is not lost completely. Perhaps by this fall I will have the room walls finished enough to paint, then I can start building the layout.

If it was easy everyone would do it.