Showing posts with label Mike. Show all posts
Showing posts with label Mike. Show all posts

Friday, September 30, 2016

DCC'ing

I have four Digitrax decoders.

I put one into a Minitrix K4. It doesn't work. I open it up and find the black wire has somehow gotten cut and is touching the gray wire. D'oh!!!

I have three Digitrax decoders.

I install one in a Minitrix K4. It doesn't work. I open it up and can find nothing wrong. I remove it and the locomotive still doesn't work. I clean the motor brushes and now it works. I give up on this Minitrix K4.

I may have three Digitrax decoders.

I install the suspect one into a Bachmann Spectrum N&W J class. It works. I am happy.

I have two Digitrax decoders and a locomotive with DCC.

I install one into a different Minitrix K4. It works. I am happy. I also now have four Pennsylvania Railroad locomotives with DCC; two Bachmann GP7's with factory decoders, one Model Power Mikado that I got the bugs worked out of last weekend, and the K4.



Friday, May 2, 2014

Model Power

The buzz is all about Model Power going out of business. I've seen on the trainboards and such all sorts of excuses and blame passed around; some say the banks, some say the business practices, some say suppliers, a soft market, etc etc etc, but I can say I know exactly what it was...hit or miss product and poor to non-existent quality control.

I have two MP Pacifics (and one on the way) and so far neither one of them have been good performers out of the box. The only reason I even have them is because they are the only manufacturer that currently offers a USRA Pacific, and now that they are gone it leaves a hole in the N scale steam lineup.

The first one, which now serves as spare parts for the other two, had a gear train that never did mesh correctly and no amount of tweaking and tuning would ever make the motor gear stay in contact with the drive gear. I tried several times before giving it up as a bad idea; taking the darn thing apart is an exercise in frustration, every time you move something you pull another wire loose and the running gear has been accurately described as a "Chinese puzzle box" which, if you ever need to take it apart, is almost impossible to put back together.

The second one, which arrived just this afternoon, looked great but as soon as I took it out of the box I found the drawbar was disconnected from the tender. It is usually held on by a plastic stud that is melted down to hold the drawbar, the mushroomed end had broken off of the stud and there wasn't enough left of it to reconnect the drawbar. So, I had to take the tender shell off, dig around in my parts box to find a suitable screw, drill a hole and reattach the drawbar. In the meantime the smokebox front fell off and had to be glued back on, and of course one of the wires broke loose in the tender and had to be reconnected. This was, I reiterate, a brand new right out of the box locomotive; besides the hobby shop I purchased it from I am the first and only owner of said loco.

I also purchased a Model Power Mikado, mostly to compare it to the Kato and Atlas locos, and it was a good trouble-free runner right out of the box. Spookshow says the Mikado suffers from the same QC issues as the Pacific so it looks like I just lucked out and got a good one. The gold standard for Mikados continues to be the now-discontinued Kato of course, hopefully they will resume production for at least another run or two sometime in the future. I have two of the Katos, one with the GHQ Pennsylvania L1 conversion (and the other one will get it as soon as I get around to it), and they are phenomenal runners; all the hype is true.

One last thing...Rapido couplers with no knuckle coupler offered? Seriously? In this day and age?

So to recap - hit or miss products, seemingly non-existent quality control, and little to no apparent effort to improve either one. Bachmann, on the other hand, has steadily improved in both quality of product and consistency. If you would like to see how to do it...or how not to...these two companies are good (and bad) examples to follow. Yeah, good riddance Model Power.

It sure would be nice to have a quality Pacific from Bachmann or Kato, the Bachmann Spectrum line would benefit from another offering and Kato already makes a suitable chassis for it in their JNR models. For that matter, whoever owns the toolings now from the old Ted Brandon designed Rivarrosi Mikado and Pacific steamers that have been distributed by Atlas and ConCor, now would be a good time to bring both of them back with improved materials for the frames and better motors, maybe gearmotors to improve the low speed performance. One can dream at least.

And finally, for those of us who have been in N scale for a while, how odd is it to say "Gosh, I wish Bachmann would make a 4-6-2 steam locomotive!"

Wednesday, April 4, 2012

Moar Power!

I have taken delivery of yet another Kato Mikado that will receive the Pennsy L1 treatment like the last one, and todays mail should bring another Bachmann Spectrum 2-8-0 that I really didn't need, but the price was too good to pass up.

The first thing I did was double-head the Mikes, they run perfectly together and they are going to look great in identical Pennsy L1 dress. The first thing I will do with the Consolidations is run them together and see how they do double-heading.

That is one of the things I really missed about my train-set Connies, when they left so did any chance I had of doubling them up. Now I will have two sets of identical locos I can double-head - or I will, as soon as I can afford another L1 kit.

I also have another Atlas Pacific, this one with its original motor. It runs very well and can be doubled up with either the Model Power or the Arnold, but not with the other Atlas due to the gearing. I'm seriously reconsidering the whole gearmotor thing, I don't like the gear whine I'm getting out of them and I am thinking that a straight drive with a flywheel might be a better option for both the Atlas Pacific and Mikado. That would also give me the option of putting them into lash-ups with the rest of the locos.

On the narrow gauge I have pulled up the Marklin turnouts and test-fitted my FastTracks turnouts. They are longer and so wont' fit in the same hole, but more importantly they are code 55 where the existing Peco track is code 60. I'll have to play around with rail joiners and such to get them to fit right, and then I will have to do something about switch machines. I'm thinking of using some of FastTrack's Bullfrogs that have the integrated microswitches. I'll have to order a couple of them and see how they do. Until then the turnouts have been replaced with straight track and now I just have a continuous loop to run trains on.

Alas no work has been done on disassembling the standard gauge layout. The shed is now filled with daughter and son-in-law's things, and the spare room is filled with daughter and son-in-law. The good thing is I get to see a lot of my infant grandson.

One of these days I won't be the answer to everyone elses problems...

Wednesday, September 28, 2011

Updates

The National Narrow Gauge Convention in Hickory NC has come and gone.

I didn't attend, no good reason just other things came along.

I never got my Saltillo modules done, so I guess it really doesn't matter anyway.

Another Atlas Pacific has joined the ever-growing standard gauge fleet, and three little Z scale Mikados arrived last week to begin their transformation.  I
have RLW parts for the pilots and cylinders and I have Bachmann 0-6-0 shells, but I could really use one more.

I'm trying a little something different with tenders this time around, I have an RLW K36 tender that I am going to put together as a temporary stand-in until I am able to afford the EBT Mikado kits. I think it will do OK, if I like it I will get two more.

And now I'm saving my nickels and dimes and writing letters to Santa for three Republic Locomotive Works EBT Mikado kits.

I would say something about benchwork, but alas I have made absolutely no progress. I have this convertible Mustang you see, and the days have been warm and sunny...

Top picture, from left to right; scratchbuilt tender Bachmann shell, completed locomotive; K37 tender, Bachmann shell, newly started locomotive; RLW EBT Mikado kit, completed locomotive.  The next two pictures show the tenders in the same order. The K37 tender needs to have its upper flange repaired, I broke it off when I was examining it.

I have two other Mikados to transform besides the one pictured, so that will bring me up to a grand total of five Mikados, one Mogul and an American. I have enough rolling stock for a rock train, two TOC coal trains (one for the Mogul and one for the American) and a passenger train. I really need one more bobber and one more eight-wheeled EBT caboose, and then I need to start acquiring and building coal hoppers. I also need to add a good number of boxcars and flatcars to the mix as well. As it is I will end up having more locomotives than trains.

I also need to dig into the new Atlas and find out why it all of a sudden just stopped running. I think I have enough rolling stock to keep most of my standard gauge locos gainfully employed, and I'm hoping the new Atlas will double-head with the Model Power Pacific.

I really need to get started on benchwork now. Winter is coming, so progress should be made sometime soon (I hope).

Tuesday, June 14, 2011

Motive Power, Part 3

It has been a long time since I have updated the site.

The Pennsy L1 is done, the paint just went on it this last weekend. It is a beautiful loco and a strong puller. It won't stay on my current horrible trackwork, but all of that will change when I get the new layout up and running.

Speaking of the new layout, I have finalized the plan for the PRR portion of the Path Valley. The PRR portion is just a double loop that incorporates an interchange with the SR&W at Duncannon PA, not prototypical at all but it will suit my needs. It will be built on a 3x7 door. I'm hoping to have construction started soon, but I have been hoping to have construction started for quite some time now.

The Atlas locos have both been re-motored and they are running fine. The Mikado does not like my trackwork any better than the Kato, but the Pacific does just fine. Both of these have to be run on a transistorized throttle that I built from an MRC unit, they ramp to full speed and don't have any fine control on a rheostat throttle. Just as well, I suppose, since I was planning on building more transistorized throttles anyway.

I picked up an Arnold Pacific as well, so now I have three Pacifics and two Mikados. The train set Consolidations have been shipped off to a new home where hopefully they are providing their new owners with good service and much enjoyment.

The train table has been cleared of trains and the track is being pulled up a little at a time. When the track is all up I will dismantle the table and hopefully be able to use it's pieces for the new benchwork. I don't know what I will end up doing with the roundhouse and turntable, but they will be stored away for future use or sale depending on what happens.

I also picked up another J class, but it is the older model and does not run. I am investigating the possibility of sending it to Bachmann for replacement, we will see how the warranty goes with the new warranty policy.

Sunday, September 19, 2010

Three Little Locos

The L1 lacks only paint and finish. It doesn't like the tight corners, but should run OK on a 15" minimum radius. I modified the drawbar connection by removing it from the locomotive and attaching it to the tender, it now hooks downward into the trailing truck to prevent contact between the loco's metal frame and the brass hook. I also hard-wired the tender to the LED light board in the locomotive, so it picks up on both sides from both locomotive and tender. The tender now needs a little weight to improve the contact, but this locomotive is as stall-free as the Bachmann Spectrum F-7's are.

The Atlas Mikado and Pacific have both received new gearmotors. They run well, but because they only pick up on one side of the locomotive chassis they can be a bit balky over turnouts. There doesn't seem to be any way to fix this, the original design had the tender picking up on one side and the loco on the other. The Bachmann tenders allow pickup on both sides, but since the Atlas frames still only pick up on one side of the locomotive a stall can occur if both tender trucks hit the same dead spot. Fortunately that doesn't happen often, and when it does a bit of track cleaning has so far taken care of it.

The Atlas locomotives run well with each other, but due to gearing differences they are both slower than the Kato mechanism under the L1. I haven't tried double-heading the Pacifics, but I will be surprised if the Model Power runs at the same speed as the remotored Atlas. The remotored Mikado isn't a very good puller when compared to the Kato, but that is no doubt due to the heavy pewter shell of the L1.

The Class J, by the way, has had it's drawbar shortened as well. Turns out that Bachmann supplied two holes to attach locomotive to tender, and it was at the furthest hole. The fix was to simply attach the locomotive to the closer of the two connecting holes.

So at this point the Atlas locomotives are complete and ready for service, and the L1 shell and tender will be painted as soon as I have time off from work to do them, along with the white metal bits on tender and loco mechanism. The Class J was ready to go from the time it came out of the box, but has now had it's minor quibble repaired. All of these locomotives have received Micro-Trains couplers on their tenders and all but the Class J has a Z scale Micro-Trains coupler in it's pilot. The fleet grows (but will soon contract by two train-set Northerns and two train-set Consolidations), so it's about time to give them a place to run.

I have ordered a new shed to be built and brought to the house, this will give me the much-needed storage space to de-clutter my "train room" and so give me the room I need to start building the new layout. First things first, the carpeting will come out and be replaced with a hard-surfaced floor of some sort. I have stick-on simulated wood strips that I will use if I have enough of them, and if not I'll see if I can find some more. If not once again, I'll look into some engineered wood floors.

I have also obligated myself to building a pair of Nn3 modules based on the East Broad Top Railroad's operations in Saltillo PA for the National Narrow Gauge Convention to be held next September in Hickory NC. To that end I have ordered the Fast Tracks Nn3 turnout kit for a #6 turnout, so I'll get to try my hand at building turnouts. If all goes well I'll get one for the standard gauge as well, and maybe I'll get crazy enough to get the ones for dual gauge. On top of that, I am trying to finish the dollhouse for the granddaughter before Christmas.

All in all I will be very busy for the next year.